The EU Carbon Border Adjustment Mechanism entered its definitive phase on 1 January 2026. Importers of covered steel goods must now report embedded emissions and surrender CBAM certificates . For coated steel products, the relevant emissions are attributed to the precursor steel substrate—not to downstream coating operations.
How embedded emissions are determined
The CBAM calculation for steel follows a defined logic: embedded emissions minus the free-allocation deduction (SEFA) equals the certificates due per tonne . For default-value declarations, the benchmark used is Column B (primary route); for verified actual data from scrap/EAF routes, Column A applies. The CBAM factor (the share of free allocation not yet phased out) falls from 97.5% in 2026 toward 0% by 2034 .
Cost implication: default values vs. verified data
Using default values carries a mark-up that increases annually. For iron and steel, the mark-up is +10% in 2026, +20% in 2027, and capped at +30% from 2028 . The table below illustrates indicative CBAM cost exposure for carbon-steel HRC under different data scenarios.
| Scenario | Emissions basis | Relative CBAM cost | Supplier action required |
|---|---|---|---|
| Default values only | Country default + mark-up | Highest | None (importer bears cost) |
| Verified installation, default precursor | Partial actual data | Medium | Site-level monitoring plan |
| Verified installation + verified precursor | Full actual data | Lowest | Full supply-chain data chain |
For a Chinese-origin HRC coil, the default direct emission intensity is approximately 3.19 tCO₂e/tonne, compared with 2.1–2.5 for Türkiye/Vietnam and 1.40 for the USA (scrap-EAF dominant) . This means origin and production route—not product form—drive the carbon cost differential.
Documentation we can provide for CBAM reporting
| Document | Status | Notes |
|---|---|---|
| Production route declaration (BF-BOF / EAF) | Available | Per heat/coil |
| Mill-specific emissions data | Available on request | Where monitoring exists |
| Default value selection record | Available | Per Commission Implementing Regulation 2025/2621 |
| Third-party verification status | Disclosed | Verifier accreditation pending industry-wide |
| Supplier declarations for inputs | Available | Per data collection template |
A key challenge for exporters is that CBAM requires a monitoring plan that can withstand independent verification . The monitoring plan covers installation boundaries, production routes, emission sources, and data quality controls. We recommend building emissions tracking into the order specification from the outset rather than retroactive data collection.
CBAM certificates will be available for purchase from February 2027, with the first annual declaration and surrender due by 30 September 2027 . Early engagement with verifiers and suppliers is advisable to avoid bottlenecks.